Pre-launch. Company in formation. No services are offered at this time.

Independent · No component sales

Know your lot before it reaches the line.

Independent lot-level integrity risk assessment for U.S. civilian electronics manufacturers. The planned company would help decide how much evidence and testing a specific lot of components needs before it enters production.

The decision this work supports

Shortages and obsolescence push electronics manufacturing services (EMS) providers and original equipment manufacturers toward independent distributors and brokers, where suspect counterfeit and nonconforming parts circulate. The question a quality or purchasing manager then faces is specific to one lot: what evidence is needed to justify trusting this particular lot, from this source, for this application?

Why lot-level evidence

ERAI, Inc. reported that 85.2% of the parts reported to it in 2024 and 81.1% in 2025 had not appeared in earlier reports. A lookup in an incident database therefore cannot by itself show that a given lot is sound.

These figures come from voluntary reports. They provide industry context; they do not measure market-wide counterfeit incidence and do not test the methodology described on this site.

Who it is for

Starting segment

Small and mid-sized U.S. EMS providers

Shortage buys from independent channels; OEM customers ask for proof of part integrity.

Later

Industrial and energy-equipment OEMs

Obsolescence of legacy parts, last-time buys and brokered purchases for long-life products.

Later

Medical-device OEMs and their contract manufacturers

Supplier controls under the FDA Quality Management System Regulation; the work would support the manufacturer’s own procedures.

Turnaround of a lot assessment (management target): document-review (L0) findings and the verification plan within two business days of a complete evidence package. Laboratory lead time is outside the company’s control. Planned services

Four working principles

Independence

No component sales. The practice would not sell, broker or hold the parts it reviews.

Evidence-based tiers

Each assessment records a risk tier, the confidence of the evidence, a recommended verification depth and a recommended disposition.

The client decides

The output is advice. The acceptance decision stays with the manufacturer and is recorded as its decision.

Independent laboratories

Testing would be performed by an ISO/IEC 17025-accredited laboratory selected and contracted by the client.

Independent evidence chain

Client

Supplies the offer, supplier documents, lot and date codes and the application’s requirements; makes the final decision.

Laboratory chosen by the client

Performs the inspection and testing the client orders, within its confirmed scope of accreditation.

Data sources

Lifecycle and incident information used under standard subscription terms, as context for the lot record.

Assessor

Assembles the evidence, recommends verification depth and records the reasoning in a retrievable lot record.

Scope. Civilian manufacturers only. Defense-related work, government contracts, civil aviation and space are excluded.

Compliance & scope · Status & roadmap

Status: planned

Planned services

Five advisory service lines are planned for the first phase, starting with small and mid-sized U.S. EMS providers. None of them is offered at this time.

LA Planned · Phase 1

Lot assessment

Scope. One scoped lot or homogeneous sublot, one manufacturer part number and one documented source path.

Result. Document review (L0), an experimental CIRS prior, a recommended verification plan, one update after the laboratory report, a Digital Component Passport (DCP) record and a recommended disposition. The client decides acceptance.

SP Planned · Phase 1

Supplier-qualification program

Scope. Up to 10 suppliers.

Result. Qualification criteria, approved-source rules, records templates and one training session.

DM Planned · Phase 1

DMSMS / BOM assessment

Scope. Up to 300 BOM lines, with detailed review of a scoped shortlist of critical items.

Result. Lifecycle screening and ranked mitigation options for the client’s decision. Larger BOMs and engineering qualification are outside the package.

RT Planned · Phase 1

Advisory retainer

Scope. Up to 20 hours a month of scoped advisory support, including a review desk for recurring sourcing exceptions.

Result. Case conferences, evidence requests, supplier escalations and follow-up. Assessments and programs are scoped separately.

TR Planned · Phase 1

Workshop

Scope. One day.

Result. Training on lot-level evidence and verification planning. Attendance certificate only; it is not a certification.

Turnaround of a lot assessment

Turnaround is a management target. Independent-channel offers are often time-limited, so a lot assessment is scoped in two stages:

  1. document-review (L0) findings and the verification plan are targeted within two business days of receipt of a complete evidence package;
  2. the post-laboratory update and recommendation within two business days of receipt of the laboratory report.

Laboratory lead time is outside the company’s control and would be stated separately in each proposal. These targets are management assumptions to be confirmed by time records in the first engagements.

Stages and close-out

The L0 findings and verification plan are the first deliverable of the lot assessment. The included post-laboratory update covers a laboratory report received within the period stated in the engagement letter. If the client decides not to test, or no report is received within that period, the engagement closes on the L0 record: the recommended disposition is stated on the available evidence, and the Digital Component Passport (DCP) records that the lot was not tested.

A synthetic example of the record shows its structure and its limits.

Limits before validation

Until the scoring model has been through a validation program whose acceptance criteria are fixed in advance, services would be limited to documented expert review. Any numerical score would be shown as experimental, with its rationale, and the client would acknowledge that status in writing before work starts.

  • No accuracy, detection-rate or savings claims.
  • No authenticity certification at any stage; the client decides acceptance.
  • Laboratory testing is ordered and paid for by the client directly with the laboratory.

Not part of the plan

Component distribution or brokering, a company-owned test laboratory, defense-related work, civil aviation and space. Software tools and methodology licenses are a conditional later phase, described on the roadmap.

Planned workflow

How a lot assessment would work

Nine steps take one lot from intake to a recorded client decision. Each step leaves a record that can be retrieved later for audits and corrective actions.

  1. Acceptance

    Restricted-party and sanctions screening, confirmation of civilian use and an engagement letter that sets out the advisory nature and limits of the service.

  2. Scope

    Criticality class, end use and the client’s own requirements for the application.

  3. Evidence intake

    Offer, supplier data, certificates of conformance, packing lists, lot and date codes, photographs, lifecycle and incident data. The provenance, date and source of each item are recorded; file hashes show that a file has not changed, not that its content is true.

  4. Initial risk record (CIRS-prior)

    Factor scoring, a risk tier, the confidence of the evidence and any critical flags. The numerical core is experimental until validation.

  5. Verification plan

    A recommended verification depth, from document review (L0) to destructive laboratory analysis (L3), and the methods to use. Reviewed by a second qualified reviewer.

  6. Testing

    The client contracts an ISO/IEC 17025-accredited laboratory of its choice; chain of custody is kept.

  7. Update and lot record

    Laboratory results are entered, the record is updated and a recommendation is issued in the Digital Component Passport (DCP).

  8. Client decision

    The client decides whether to accept, test further, quarantine or reject the lot, and records that decision.

  9. Records and complaints

    Retention under the contract and applicable law; corrections are appended, never overwritten; complaints and report withdrawals are logged.

Four-eyes review. An engagement that requires independent review is accepted only when a second qualified reviewer is available. The person who creates a record does not act as its independent reviewer.

CILM — Component Integrity and Lifecycle Management

Methodology and its limits

CILM in plain terms

CILM treats risk not as a fixed property of a part number or a supplier but as a consequence of how much verifiable evidence exists about the provenance and history of a specific lot.

Five factors are considered: supply-channel structure, counterfeit exposure frequency, verification quality, documentation integrity, and component criticality and lifecycle. Its scoring core, the Composite Integrity Risk Score (CIRS), maps them to one of four risk tiers with a separate confidence level. The tier and the application’s criticality indicate a recommended verification depth, from document review (L0) to destructive laboratory analysis (L3). Laboratory results update the record.

The output is always a risk tier, evidence confidence, a recommended verification depth and a recommended disposition — never an authenticity determination. The client makes the acceptance decision.

What CILM does not do

  • It does not certify components or suppliers.
  • It does not replace accredited testing.
  • It does not determine authenticity.
  • It does not constitute an industry standard. Its L0–L3 and C0–C4 scales are its own, not scales defined by SAE or IPC.
  • Until validated, a CIRS score is experimental and is not a calibrated probability that a part is counterfeit.

Mandatory client requirements, critical contradictions in the evidence and unresolved lot identity are escalation conditions that a favorable composite score cannot offset. Where the evidence cannot support a defensible recommendation, the report names the unresolved issue and recommends quarantine, more evidence, further testing or rejection.

A test that detects no anomaly does not by itself establish unbroken provenance or suitability for every application. Likewise, complete documentation does not by itself establish the physical condition or fitness of the parts.

Maturity

ElementStatusImplication
Framework: factors, tiers, verification depths L0–L3, DCP structureDocumented draftUsed as a structured checklist in expert advisory work
CIRS weights, thresholds and override rulesDraft expert values; experimental until validationNumerical scores shown as experimental, with the expert rationale; no accuracy or performance claim
Validation programDesigned; not executedAcceptance criteria are fixed in the protocol before any case is labeled
Independent evaluation casesTo be assembled under a documented protocol and appropriate data rightsNo set of independently labeled lots exists yet; case unit, inclusion rules and duplicate controls are defined before collection
Operating procedures (SOPs) and DCP templateApproved for development; not yet producedRequired before the first paid assessment
Crosswalk to published industry standardsApproved for development; not yet producedPrepared after the licensed texts are purchased and before any client deliverable cites a specific clause; until then, reports cite standards by identifier only
SoftwareNoneConditional later phase

The calculation weights, thresholds and override rules are confidential and are not published here.

Published material

Planned company policy

Compliance and scope

Civilian scope only

The planned practice would serve U.S. civilian manufacturers only: electronics manufacturing services providers, industrial and energy-equipment manufacturers, and medical-device manufacturers and their contract manufacturers. Independent distributors and testing laboratories would be later licensees in Phase 3, which is conditional.

Excluded now and in the future: defense-related work and programs, and government contracts. Also excluded: civil aviation and space. Requests from these sectors will be declined.

No services to persons located in Russia or Belarus. These are company decisions, adopted in addition to legal requirements.

Before any engagement

  • Restricted-party and sanctions screening of the client and named parties, including ownership.
  • Confirmation that the work is civilian and involves no defense articles or controlled defense data.
  • An engagement letter setting out the advisory nature and limits of the service.
  • Agreement on data handling.
  • Outside counsel reviews export-control and sanctions questions for the planned data flows before the first contract.

Terms that are kept apart

Management-system certification, laboratory accreditation, testing of a specific lot and a customer’s approval of a supplier are different things and are never described as interchangeable. Testing is performed by the laboratory the client selects, within that laboratory’s confirmed scope of accreditation. Advice does not replace the client’s acceptance decision.

Data handling

Client files would be stored in access-controlled cloud storage with logging, backup and restoration testing. Lot records separate client-owned records, licensed third-party data and the assessor’s analysis. Reuse of client data for any other purpose requires a documented rights basis.

Conflicts of interest

The practice would not sell the parts it reviews. The client chooses the laboratory; any referral fee would be disclosed in writing; no compensation would depend on the outcome of an assessment.

This page describes intended policy. It is not legal advice.

Gated by conditions, not by dates

Status and roadmap

Each phase begins only when its entry conditions are met, not when a date arrives. The current phase is Phase 0: pre-launch preparation.

Month 1 is the first operating month as defined in the business plan (Section 1.1), after the conditions listed there are met. Where the business plan’s financial model uses a month for one of these conditions, it is an illustrative modeling assumption, not a scheduled date.

Phase 0 — Pre-launch

Goal. Legal, compliance and delivery readiness.

Gate to the next phase. At least three written, non-binding expressions of interest from civilian manufacturers; at least two accredited laboratories willing to accept client work; capital documented.

Stop or revise if. No expressions of interest after six months of outreach.

Phase 1 — Founder-led advisory for EMS providers

Goal. Prove paid demand and delivery quality, with one analyst added after the start.

Gate to the next phase. Revenue run-rate threshold set in the business plan.

Stop or revise if. Fewer than five paying accounts by Month 12: revise the segment or pricing.

Phase 2 — Productized services

Goal. Replicable delivery; add industrial, energy-equipment and medical-device manufacturers.

Gate to the next phase. All four software conditions listed below.

Stop or revise if. Validation outcome below the criteria fixed in advance: software stays on hold; services continue.

Phase 3 — Software and licensing (optional)

Goal. A CIRS/DCP software workbench and methodology licenses, only if every condition is met.

Gate to the next phase. Continuation test twelve months after the software is introduced.

Stop or revise if. Fewer than eight paying software customers at that point: no new sales or renewals; existing contracts are served to term; services continue.

Software conditions

Software and licenses would be added only when all four conditions are met, each with its own evidence:

  1. a validation report whose outcome meets acceptance criteria fixed in advance;
  2. five signed design-partner agreements;
  3. MVP formally accepted by the design partners;
  4. a founder decision to enable the program.

The planned services do not depend on the software.

Current pre-launch status

ItemStatus
Three-part article series, Supply Chain Management ReviewPublished (30 Jun, 7 Jul, 14 Jul 2026)
White paper on ZenodoPublished
CILM framework and calculation manualDrafts; not validated
Pre-launch website (this site)Restates the business plan; states that the company is in formation and offers no services; records non-binding expressions of interest
Company formation, bank account, insuranceNot started
Expressions of interest from U.S. manufacturersNone yet; collected through this site
Arrangements with accredited laboratoriesNot yet in place
Export-control and sanctions compliance policyTo be drafted with counsel

Insights

A three-part series by Alexander L. Litvin in Supply Chain Management Review, and the CILM white paper.

Supply Chain Management Review · 30 June 2026

The Hidden Supply Chain Risk No Dashboard Shows

On the distinction between supplier-level risk and the integrity of a specific component lot.

Supply Chain Management Review · 7 July 2026

When Component Verification Becomes Operational

On what changes, and what it costs, when each component lot is verified as its own risk unit.

Supply Chain Management Review · 14 July 2026

Why Companies Blame the Wrong Supplier — and Miss the Real Failure

On why post-failure investigations often stop at the last traceable supplier instead of the point where the problem entered the chain.

Zenodo · white paper

CILM white paper

Dated public description of the approach. A description, not a validation.

Founder

Alexander L. Litvin

Alexander L. Litvin has worked in electronic-component supply since 1998, sourcing components through authorized and independent channels for industrial customers, including end-of-life and hard-to-find parts. His practical focus is integrity and lifecycle risk: evaluating sources, suppliers, lot-specific evidence, verification needs and component obsolescence.

He is the author of the Component Integrity and Lifecycle Management (CILM) methodology and its scoring core, the Composite Integrity Risk Score (CIRS), and of a three-part series on component-level integrity risk in Supply Chain Management Review. He is an IEEE Senior Member.

Planned role

Founder and principal methodologist of the planned company: methodology governance and validation, review of complex or high-criticality assessments, supplier-qualification design and professional training. The planned company is the vehicle through which he intends to continue this work in the United States.

CILM and these planned activities are independent personal initiatives; see theindependence statement.

Non-binding

Register interest

If lot-level evidence decisions are a recurring problem in your plant, tell us about it. Your answers help decide whether and how the planned practice launches.